- the balancer;
- grabs;
- hydraulic tank;
- an arrow;
- DK-4;
- two measuring tanks with starting fuel;
- starting table;
- remote control for the boom, jacks and stops;
- backstops;
- supports;
- remote control STR 9B46M;
- 4 air cylinders of high pressure;
- Operator's cabin with remote control equipment РН, ShchUG, PA, 2В12М-1, 2В26, П61502-1, 9В362М1, 4А11-E2, ПОГ-6;
- ABB;
- box of remote control 9B344;
- in the cabin 2 cylinders of air start of the marching engine;
- under the GDL-10 cabin;
- in the deckhouse APD-8-P/28-2 and devices from the set 8Sh18;
- the equivalent of SU 2B34;
- the equivalent of CAD 2B27;
- devices from the set 8Sh18;
Linked materials: